close Warning: Can't synchronize with repository "(default)" (Unsupported version control system "svn": No module named svn). Look in the Trac log for more information.

Error: Invalid Date

"2008-06-26T20%3A57%3A27Z" is an invalid date, or the date format is not known. Try "MMM d, y" or "YYYY-MM-DDThh:mm:ss±hh:mm" instead.

TracGuide — The Trac User and Administration Guide